Primary Docketer | Co-Docketer | Notified Staff | Docket Number | Docket Title | Docket Text | Public Hearing | Hearing Vote | Date |
---|---|---|---|---|---|---|---|---|
National Grid | John Daghlian PW | #398-24 | Request for a grant of location in Washington Street | NATIONAL GRID petition for a grant of location to install and maintain gas main in Washington Street as follows: • Approximately 3210 ft. of 8 in. plastic in Washington St. from the existing 24 in. Cast Iron in Commonwealth Ave. to the railroad crossing at #1940 Washington St. to replace approximately 3105 ft. of 10 in. LP Cast Iron (1899) and approximately 15 ft. of 10 in. Coated Steel (1976) • Approximately 250 ft. of 2 in. plastic in Bonmar Cir. from the new 8 in. plastic in Washington St. to the end of main at #15 Bonmar Cir. to replace approximately 250 ft. of 6 in. Cast Iron (1926) • Approximately 230 ft. of 2 in. plastic in Angier Cir. from the new 8 in. plastic in Washington St. to end of main at #19 Angier Cir. to replace approximately 230 ft. of 6 in. Cast Iron (1927) • Abandonment of approximately 25 ft. of 10 in. Cast Iron in the intersection of Washington St. and Woodland Rd. (cut and cap the existing 6 in. Cast in Woodland Rd.) • Approximately 30 ft. of 6 in. plastic stub in the intersection of Washington St. and Hope St. (cut and cap the existing 6 in. Cast Iron in Hope St.) to replace approximately 30 ft. of 6 in. Cast Iron (1928) • Approximately 320 ft. of 2 in. plastic in Seton Hill Rd. from the new 8 in. plastic in Washington St. to end of main at #20 Seton Hill Rd. to replace approximately 25 ft. of 4 in. Cast Iron (1899), approximately 20 ft. of 4 in. plastic (2000) and approximately 275 ft. of 4 in. Coat Steel (1951) • Approximately 30 ft. of 6 in. plastic stub in the intersection of Washington St. and Leslie Rd. (cut and cap the existing 6 in. Cast Iron in Leslie Rd.) to replace approximately 30 ft. of 6 in. Cast Iron (1927) • Approximately 20 ft. of 6 in. plastic stub in the intersection of Washington St. and Day St. (cut and cap the existing 4 in. Bare Steel in Day St.) to replace approximately 20 ft. of 4 in. Bare Steel (1940) • Approximately 745 ft. of 6 in. plastic in Aspen Ave. from the new 8 in. plastic Washington St. to the existing 6 in. at #115 Aspen Ave. to replace approximately 745 of 6 in. Cast Iron (1914) • Installation of 85 ft. of 6 in. 22 plastic in Aspen Ave. between the gap at #112 and #115 Aspen Ave. • Approximately 55 ft. of 2 in. plastic in the intersection of Forest Ave. and Aspen Ave. to replace 55 ft. of 6 in. Cast Iron (1914) • Abandonment of approximately 95 ft. of 4 in. plastic (1998) in private property between Stanton Ave. to Day St. and approximately 330 ft. of 2in. plastic in Stanton Ave. from the new 8 in. plastic in Washington St. to end of main at #25 Stanton Ave. to replace 330 ft. of 4 in. plastic (1998) | Open: 2024-10-23 |
10-16-24 | ||
Public Hearing Vote: [ Yes-No-Absent-Recused-Not Voting ] |
Committee | Meeting Date | Present | Meeting Motion | Meeting Action | Vote* | Amended Motion | Reconsideration | Reconsideration Vote* | Meeting Agenda | Meeting Report | |
---|---|---|---|---|---|---|---|---|---|---|---|
Public Facilities | 10-23-24 | Present: Councilors Albright (Chair), Getz, Kelley, Kalis, Gentile, and Danberg; absent: Councilors Leary and Laredo; also present: Councilor Bixby | Motion to Hold | Held |
6-0 |
||||||
Public Facilities | 11-06-24 | Present: Councilors Albright (Chair), Getz, Kelley, Kalis, Gentile, Leary and Laredo; absent: Councilor Danberg | Motion to Hold | Held |
6-0 |
Agenda | Report | ||||
Public Facilities | 12-04-24 | Present: Councilors Albright (Chair), Getz, Kelley, Gentile, Leary, Laredo, and Danberg; absent: Councilor Kalis; also Present: Councilors Greenberg and Malakie | Motion to Approve | Approved |
4-2-1 |
Agenda | Report | ||||
Vote: [ Yes - No - Abstain - Absent - Recused - Not Voting] Reconsideration Vote: [ Passed - Hold ] |