National Grid John Daghlian PW #396-24 Request for a grant of location in Centre Street NATIONAL GRID petition for a grant of location to install and maintain gas main in Centre Street as follows: • Approximately 1135 ft of 12 in. plastic main in Centre St. from the existing 12 in. coated steel in Centre Ave. to the existing 10 in. Cast Iron at #543 Centre St. to replace approximately 65 ft. of 10- in. Cast Iron (1899), approximately 85 feet of 12 in., Bare Steel (1964), approximately 935 feet of 10 in. Cast Iron (1899), approximately 15 ft. of 10 in. Bare Steel (1899), approximately 20 ft. of 12 in. Coated Steel and approximately 15 ft. of 10 in. Coated Steel • Approximately 1125 ft. of 12 in. plastic main in Vernon St. from Centre St. to Park St. to replace approximately 50 feet of 4- inch, Cast Iron (1898), approximately 775 feet of 6- inch, Cast Iron (1930) and approximately 300 feet of 6- inch, Bare Steel (1933) • Approximately 100 ft. of 6 in. plastic main in the intersection of Eldredge St. and Vernon St. to replace approximately 85 feet of 6- inch, Cast Iron (1930) and approximately 15 feet of 6 -inch, Bare Steel (1933) • Approximately 40 ft. of 6 inch plastic main in the intersection of Baldwin St. and Vernon St. to replace approximately 40 feet of 6 -inch, Cast Iron (1930) • Approximately 320 ft. of 8 in. plastic main in Mt Ida St. from Centre St. to the existing 6 in. plastic main in Newtonville Ave. to replace approximately 320 feet of 6- inch, Bare Steel (1938) • Approximately 720 in. plastic main in Hollis St. from the existing 10 in., Cast Iron (1899) at #515 Center St. to the existing 10 in. Cast Iron (1899) at #543 Centre St. to replace approximately 405 feet of 3- inch, Wrought Iron (1933) and approximately 315 feet of 3- inch, Cast Iron (1903) • Approximately 610 ft. of 8 in. plastic in Church St. from Centre St. to the existing 8 in. plastic (2015) at #120 Church St. to replace approximately 595 ft. of 4 in. Cast Iron (1910) and approximately 15 ft. of 6 in. plastic (1999) • Abandonment of approximately 40 ft. of 4 in. Bare Steel (1953) in Wesley St. (South) and approximately 30 ft. of 4 in. Bare Steel (1948) in Wesley St. (North) Open: 2024-10-23


10-16-24
Public Hearing Vote: [ Yes-No-Absent-Recused-Not Voting ]

Committee Meeting(s)

Committee Meeting Date Present Meeting Motion Meeting Action Vote* Amended Motion Reconsideration Reconsideration Vote* Meeting Agenda Meeting Report
Public Facilities 10-23-24 Present: Councilors Albright (Chair), Getz, Kelley, Kalis, Gentile, and Danberg; absent: Councilors Leary and Laredo; also present: Councilor Bixby Motion to Hold Held 6-0
Public Facilities 11-06-24 Present: Councilors Albright (Chair), Getz, Kelley, Kalis, Gentile, Leary and Laredo; absent: Councilor Danberg Motion to Hold Held 6-0
Agenda Report
Public Facilities 12-04-24 Present: Councilors Albright (Chair), Getz, Kelley, Gentile, Leary, Laredo, and Danberg; absent: Councilor Kalis; also Present: Councilors Greenberg and Malakie Motion to Approve Approved 4-2-1
Agenda Report
Vote: [ Yes - No - Abstain - Absent - Recused - Not Voting]  Reconsideration Vote: [ Passed - Hold ]

Whole City Council Meeting

Council Motion Council Action Council Order Council Vote* Reconsideration Reconsideration Vote* Council Note
City Council Vote order: [ Yes - No - Absent - Recused ]  Reconsideration Vote: [ Passed - Hold ]